Chestermere (Westmere) Booster Station

Description

A booster station was designed and constructed to boost the water pressure within specific areas of the Town of Chestermere during peak flow times.

The booster station monitors the water pressure in the area.  If the water pressure is low the booster pump station is activated to maintain minimum pressures in the distribution system.

Project in Brief

Client: Town of Chestermere

Location: Chestermere, AB

Cost: $785,000

Type: In-Line Pumps

Sim-Flo’s Role

Sim-Flo was retained to provide design of the booster station and field inspection services.

westmere booster station-1.jpg