Lakewood Lift Station

Description

The Lakewood Lift Station services a new development area within the Town of Strathmore.  There is no economical means to transfer sewage from the lift station to the sewage treatment plant either by forcemain or gravity sewer.  The solution to this problem is to provide sewage effluent storage on site and to pump into an existing nearby sewage lift station.

The existing lift station has excess capacity that varies throughout the day.  A monitoring syste has been installed that will determine the excess capacity of the existing lift station and allow the new Lakewood lift station to pump at safe pumping rates as determined by the monitoring system.

Communications between the existing lift station and the Lakewood lift station is done using radios.

The monitoring system also logs data on a continuous basis and sends the data to an offsite location over the internet for further analysis.

Project in Brief

Client: Devmore Developments

Location: Strathmore, Alberta

Cost: $800,000

Sim-Flo’s Role

Sim-Flo was retained to dsign and implmenet the control system.  The electrical building, electrical controls and standby generator was done as a design build.  Sim-flo Systems provided the design for this system.

Lakewood LS.jpg